Certified 2021 BMW M2 Competition

Stock: Q00775VIN: WBS2U7C01M7G45640

Stock: Q00775 VIN: WBS2U7C01M7G45640

Certified 2021 BMW M2 Competition

Detailed Pricing
Price:
$52,880
Admin Fee:
+ $620
Oakes Price:
$53,500
CALL NOW VALUE YOUR TRADE

Vehicle Highlights

Located at Oakes Kia Of Olathe

Overview
Q00775
Stock
WBS2U7C01M7G45640
VIN
22,764
Miles
Coupe
Body
RWD
Drivetrain
Alpine White
Exterior
Black/Blue Stitching
Interior
106
Wheelbase
3.0L I6
Engine
Gas
Fuel
7-Speed Automatic
Transmission
2
Doors
23*
Highway MPG (EPA estimate)
16*
City MPG (EPA estimate)
Description
Drive smarter @OakesKiaOlathe.com! Your trusted Olathe Kia dealer near me for the best Kia deals in Olathe, featuring the all-new Kia EV9 Olathe and the iconic newly designed Telluride!

This 2021 BMW M2 Competition Coupe is painted in Alpine White with a Black Dakota Leather interior with Blue Stitching, is an AutoCheck One-Owner vehicle with a Clean AutoCheck, and is 11,429 miles below market average. It features Apple CarPlay. It comes with the following packages:
Executive Package

The BMW M2 Competition Coupe combines exhilarating M performance with distinctive styling and a driver-focused premium cabin. Its Executive Package adds a heated steering wheel, Adaptive Full LED Lights, wireless charging, Automatic High Beams, and Speed Limit Info, while the M Double-Clutch Transmission with Drivelogic, M Sport Brakes, M Sport Seats, Harman/Kardon premium audio, and Carbon Fiber trim further enhance its performance-focused character.

At Oakes Kia, you are not just buying a car, you are becoming part of the family. As the trusted Olathe Kia dealer near me, we take pride in offering transparent pricing, outstanding service, and a wide selection of new and pre-owned vehicles for drivers across Olathe and the surrounding area. Visit our Olathe Kia dealership to explore the newest models, find the best Kia deals in Olathe, and experience exciting options like the Kia EV9 Olathe. Whether you are ready to upgrade your vehicle or take advantage of Kansas EV tax credit savings, Oakes Kia keeps your journey simple, rewarding, and focused on you.

In addition, below are upgrades and added options:
M Double-Clutch Transmission with Drivelogic
Wheel Locks
Stainless Steel Pedals
Harman/Kardon Premium Sound System
Navigation System
19" M Forged Black Y-Spoke Wheels Style 788 M
M Sport Brakes with Blue Calipers
M Sport Seats
Heated Front Seats
Heated Steering Wheel
Carbon Fiber Trim
Adaptive Full LED Lights
Universal Garage-Door Opener
Wireless Charging

Other premium features include Adaptive Full LED Lights, Automatic High Beams, Executive Package, Heated Steering Wheel, Speed Limit Info, WiFi Hotspot, Wireless Charging.

Buy in confidence with Oakes Auto Certified Pre-Owned Program! Select Pre-Owned models will receive a Free 6 months / 6,000-mile warranty! With our laid-back, quick, and pain-free sales process, our high standard of customer service, and our many financing options, we know you will find Oakes Auto to be a welcome change from your past experiences.

Oakes Auto Group is a family-owned and rapidly growing automotive dealership network founded in 2010 in the Kansas City area. With a commitment to transparency, respect and exceptional service, their mission is to treat every customer like part of the family offering top quality vehicles, honest financing and lifetime support. Their recent expansion into Johnson County, including the acquisition of Oakes Kia of Olathe, reflects a dedication to being locally rooted while delivering big-brand value.

Features
Apple CarPlay

Apple CarPlay

Bluetooth®

Bluetooth®

Brake Assist

Brake Assist

Heated Seats

Heated Seats

Heated Side Mirrors

Heated Side Mirrors

Keyless Entry

Keyless Entry

Memory Seats

Memory Seats

Navigation

Navigation

Parking Assist

Parking Assist

Power Seat

Power Seat

Power Windows

Power Windows

Rain Sensing Wipers

Rain Sensing Wipers

Rearview Camera

Rearview Camera

Satellite Radio

Satellite Radio

Security System

Security System

Side-Impact Air Bags

Side-Impact Air Bags

Stability Control

Stability Control

WiFi Hotspot

WiFi Hotspot

Heated Steering Wheel

Heated Steering Wheel

Details
Model Overview
The BMW 2-Series is available in two trim levels, 230i and M240i. Both come as 2-door coupes or convertibles. Both cars are rear-wheel drive, though xDrive all-wheel drive is available on both trims. The 230i is powered by a 2.0L 4-cylinder turbocharged engine producing 248 horsepower and 258 pound-feet of torque. The M240i features a turbocharged 3.0L straight-six powerplant that produces 335 horsepower and 369 pound-feet. Both cars come standard with an 8-speed automatic transmission, but a 6-speed manual is a no-cost option on either model.

A big part of the mission of the 2-Series is to be fun to drive. BMW has accomplished this through an all-independent suspension with a 5-link rear suspension setup, a fairly unique feature in this class. The 2-Series is thus able to out-handle most of its competitors in addition to being quite quick in a straight line. Body roll, dive and squat are all nicely controlled without compromising the car's ride quality.

The BMW 230i is the more pedestrian of the two models but still comes reasonably well equipped. Standard features include 17-inch alloy wheels, 60/40 folding rear seats, a leather-wrapped steering wheel with controls for the stereo and Bluetooth setup, sport buckets front seats, automatic climate control, push button start, rain-sensing wipers, power folding heated mirrors, LED headlight a and a memory system that remembers the driver's favorite settings for everything. The 230i can be equipped with either Sport Line or M Sport upgrades, which add features like larger wheels, rear spoiler, improved suspension calibration and more.

The 2-Series' infotainment system comes with 6.5 touchscreen, six-speaker sound system, SiriusXM satellite radio, voice-activated navigation, USB port, Apple CarPlay compatibility, USB port and three 12v power sockets.

The M240i comes better equipped, starting of course with the stronger engine. Other features on the M240i include bigger brakes, 18-inch alloy wheels, power lumbar front seating, a sports instrument cluster and dynamic cruise control.

Optional items on the 2-Series include leather seating surfaces, satellite radio, heated seats, a moonroof, a Harman/Kardon premium sound system and concierge services. Packages include a driver assistance package with a rear-facing camera, as well as a technology package, which includes a navigation system with real-time traffic updates and access to BMW apps. A Track Handling Package adds Adaptive M Suspension, variable sport steering, M Sport brakes and Michelin Pilot Super Sport tires.

The 2-Series convertibles in both 230i and M240i guise are equipped similarly to their coupe counterparts, with a power-operated top that takes just 20 seconds to raise or lower.

Safety features include anti-lock brakes, stability/traction control and several airbags. The BMW 2-Series also comes standard with an emergency request system that will activate in the event of an accident. The system comes with a 10-year subscription.
Model Strengths
Sporty
Compact
Fun To Drive
Rear-wheel Drive Or All-wheel Drive Availability
European Feel
Convertible Option
Model Changes
For 2021, the BMW 2-series remains essentially unchanged while a new generation 2-series is anticipated for 2022.
Model Value
The BMW 2-Series is a sporty luxury compact that competes with other small European cars such as the Audi A3, the MINI Cooper and the Mercedes CLA. The BMW 2-Series, however, is significantly sportier than its competitors and features better handling and a more hardcore, driver-oriented demeanor. The BMW 2-Series offers a nice compromise between an all-out sports car and a sophisticated German compact.
Features
Navigation System
Executive Package
12 Speakers
AM/FM radio: SiriusXM
AM/FM Stereo
harman/kardon Logic 7 Digital Surround
harman/kardon Speakers
Radio Control US
Radio data system
SiriusXM Satellite Radio
Air Conditioning
Automatic temperature control
Front dual zone A/C
Rear window defroster
Lumbar Support
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel mounted audio controls
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Knee airbag
Low tire pressure warning
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Automatic High Beams
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Adaptive Full LED Lights
Auto-dimming door mirrors
Bumpers: body-color
Heated door mirrors
Power door mirrors
Spoiler
Turn signal indicator mirrors
Advanced Real-Time Traffic Information
Apple CarPlay Compatibility
Auto-dimming Rear-View mirror
BMW Assist eCall
BMW TeleServices
ConnectedDrive Services
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Hands-Free Bluetooth & USB Audio Connection
Heated Steering Wheel
Illuminated entry
Leather Shift Knob
Outside temperature display
Passenger vanity mirror
Rear seat center armrest
Remote Services
Speed Limit Info
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
WiFi Hotspot
Wireless Charging
Dakota Leather Upholstery
Front Bucket Seats
Front Center Armrest
Heated Front Seats
Heated front seats
M Sport Seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 19" x 9" Fr & 19" x 10" Rr M Forged
Wheels: 19" x 9" Fr & 19" x 10" Rr M Forged Black
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
Acoustical Package
@OakesKiaOlathe.com
Mechanical
Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo
Engine Auto Stop-Start Feature
Rear-Wheel Drive
3.46 Axle Ratio
Engine Oil Cooler
90-Amp/Hr Maintenance-Free Battery w/Run Down Protection
Regenerative 210 Amp Alternator
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Sport Tuned Suspension
Electric Power-Assist Speed-Sensing Steering
13.7 Gal. Fuel Tank
Quasi-Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
Strut Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
Cell Phone Pre-Wiring
Electro-Mechanical Limited Slip Differential
Exterior
Tires: 245/35R19 Fr & 265/35R19 Rr Mixed Perf
Tire Mobility Kit
Body-Colored Front Bumper
Body-Colored Rear Bumper
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Fully Galvanized Steel Panels
Lip Spoiler
Black Grille
Trunk Rear Cargo Access
Perimeter/Approach Lights
LED Brakelights
Entertainment
harman/kardon Premium Sound System
12 Speakers
Premium Amplifier
Automatic Equalizer
Audio Theft Deterrent
Digital Signal Processor
Streaming Audio
Window Grid Diversity Antenna
1 LCD Monitor In The Front
Interior
M Sport Seats
Power Front Seats
Heated Front Seats
2-Way Driver Seat -inc: Manual Cushion Extension
2-Way Passenger Seat -inc: Manual Cushion Extension
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Fixed Rear Windows
Lumbar Support
Sport Leather/Metal-Look Steering Wheel
Front Cupholder
Rear Cupholder
Interior Lock Disable
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Comfort Access Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
Dual Zone Front Automatic Air Conditioning
HVAC -inc: Underseat Ducts, Residual Heat Recirculation and Console Ducts
Illuminated Locking Glove Box
Driver Foot Rest
Interior Trim -inc: Carbon Fiber Instrument Panel Insert, Carbon Fiber Door Panel Insert, Carbon Fiber Console Insert and Piano Black/Aluminum Interior Accents
Full Cloth Headliner
Alcantara Simulated Suede Door Trim Insert
Leather/Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Full Floor Console w/Covered Storage, Seat Integrated Console w/Storage and 3 12V DC Power Outlets
Front Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Cargo Area Concealed Storage
Cargo Net
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Navigation System
ConnectedDrive Services
Advanced Real-Time Traffic Information
Remote Services
Apple CarPlay Compatibility
Memory Settings -inc: Driver Seat and Door Mirrors
Tracker System
Driver And Passenger Door Bins
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
Delayed Accessory Power
BMW TeleServices
Driver Information Center
Outside Temp Gauge
Analog Appearance
Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
Sliding Front Center Armrest and Rear Center Armrest
2 Seatback Storage Pockets
Perimeter Alarm
Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Park Distance Control Front And Rear Parking Sensors
Frontal Collision Warning w/City Collision Mitigation
Lane Departure Warning
Collision Mitigation-Front
Driver Monitoring-Alert
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
Back-Up Camera
Similar Vehicles

2022 BMW X5 M50i

Stock: Q00668

Quick View

2019 BMW X5 xDrive40i

Stock: Q00691

Quick View

2025 GMC Sierra 1500 AT4

Stock: G250982A

Quick View

Dealer FAQs

Can I get financed for an auto loan at Oakes Auto?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Oakes Auto to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call (913) 222-5300 or apply online now.

What are the steps in the financing process at Oakes Auto?

Great question. Securing a competitive loan from Oakes Auto takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call (913) 222-5300. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Kansas City.

What is the financing process like at Oakes Auto?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What is involved in securing an auto loan in Kansas City KS & North Kansas City MO?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Kansas City come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at Oakes Auto to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial (913) 222-5300 when you have a few free moments and you'll soon see that getting approved for a car loan at Oakes Auto is quick, easy, and convenient.

* Pricing - All vehicle pricing shown is assumed to be correct and accurate. Incentives, credit restrictions, qualifying programs, residency, and fees may raise, lower, or otherwise augment monthly payments. Additionally, incentives offered by the manufacturer are subject to change and may fluctuate or differ based on region and other considerations. Unless otherwise noted or specified, pricing shown does not include title, registration, or tax fees and costs.

* MPG - Vehicle information, as well as features and other inclusions, may vary by model and are based exclusively on standard equipment. No claims, warranties, or guarantees have been made related to the accuracy of customer payments, model equipment, or vehicle pricing. Please call with any questions you might have and to reassert the accuracy of any information presented here.


* By providing your phone number, you consent to receive occasional SMS or voice calls from us regarding our products, services, and promotional offers. Standard messaging rates may apply.

© 2026 Oakes Auto

Locations